Lines are going down
Saved melted snow from Puget Sound Hockey Center is poured on to the new Tacoma Twin Rinks
Making Ice
Freezing Sand
Laying Sand
Boards are here and coming in
Pad for Lift is filled in
Glass railing for South Mezzanine
laying the cooling pipes and under the ground heating system, separated by vapor barriers and insulation.
Looking at the café/bar from the south rink
Under the Rink Heating system’s headers
Skate Rental Counter w/roll up door
South Scoreboard is ready to be hung
Dirt is leveled and ready for heat system
Exterior wall is closing up
ProShop gets heat
Main staircase gets installed
Door to future Skate rental room and Zamboni room
Locker room 1
Locker room 1
Showers for locker 1 and 2
Bathroom for locker rooms 1 and 2
Locker room 2
Locker room 2
Locker room 3
Showers for Locker rooms 3 and 4
Bathroom for locker rooms 3 and 4
Locker room 4
Future Locker room for possible Junior or Men’s League Team
Team Coaches’ office
Team’s shower and bathroom
Windows are being framed for the food/beverage service
Cooling pipes are installed through the Zamboni Room
New Views from upstairs
Zamboni and Skate counter walls are starting to be framed downstairs, between the rinks
Exterior walls of South Locker Rooms are primed
Upstairs Mezzanine continues to get concrete floor
Future weight room
Future 2 offices upstairs and Elevator landing
Future home of our food/beverage service
Stairs are installed and concrete for steps is poured on the South Staircase
South Wall is extended and going back up
South wall continues to come down
South wall is starting to come down for new extension
Electrical upgrade is complete for building
New Chiller is getting plumbed to the South Rink
New South Exterior Wall and extension is delivered!!!
Interior walls are starting to be closed up for South Locker Rooms
Asphalt is covered the new parking spots
Concrete is poured for ice rink curbing of South rink.
Steal supports are going up in lobby
New Electrical panel and vault installed for increased 2000amps
Running supply and return pipes for new rinks from the Chiller
Plumbing Vents for new bathrooms in locker rooms for the South Rink
New Electrical conduit ran under rink for new locker rooms
Concrete is poured for the south Mezzanine floor and ceiling of locker rooms
Zamboni room floor is poured
Main Glycol lines, sub terrain through the Zamboni room